解放思想破冰突围 对标实干聚力赋能 水务公司开展重点项目现场参观交流活动 ◇ Water demand outstrips supply in Pakistan’s Punjab, says UN agency ◇ India, Bangladesh should renew Ganges Water Treaty for 3-5 years: Expert ◇ Saudi Arabia cancels Indian firm’s desalination plant tender ◇ 津巴布韦卡马蒂维矿区供水工程投运覆盖600户家庭 ◇ Tripartite agreement signed for ₹1,000-crore desalination project in Odisha ◇ 尼加拉瓜22兆瓦供水配套光伏电站投运 投资1500万美元配置3.3万块组件 ◇ 三峡大学水利工程学科博士生在《Science》发表Letter文章 ◇ Japan turns tap water into antenna ◇ Illinois awards more than $3 Million for wastewater plant energy resilience ◇解放思想破冰突围 对标实干聚力赋能 水务公司开展重点项目现场参观交流活动 ◇ Water demand outstrips supply in Pakistan’s Punjab, says UN agency ◇ India, Bangladesh should renew Ganges Water Treaty for 3-5 years: Expert ◇ Saudi Arabia cancels Indian firm’s desalination plant tender ◇ 津巴布韦卡马蒂维矿区供水工程投运覆盖600户家庭 ◇ Tripartite agreement signed for ₹1,000-crore desalination project in Odisha ◇ 尼加拉瓜22兆瓦供水配套光伏电站投运 投资1500万美元配置3.3万块组件 ◇ 三峡大学水利工程学科博士生在《Science》发表Letter文章 ◇ Japan turns tap water into antenna ◇ Illinois awards more than $3 Million for wastewater plant energy resilience ◇
Lower Compressor Cut Off Temperature for HPWH (°F)
1 °F
Max. Amps
20.2
Recovery Efficiency (%)
435 %
Tank Height (inches)
59 inches
Tank Diameter (inches)
18 inches
Connected Capable
Yes
Connects Using
CTA-2045
DR Protocol
CTA-2045-A,CTA-2045-B
Communication Hardware Architecture
B - Manufacturer-specific external communication module (s) and/or device (s),C - Open standards-based communication port on the appliance with open standards-based communication module
Load Up Functionality
Advanced Load Up
Optional Operational Mode Functionality
Relative Price Signals,Set Point Adjustment
Time of Use Schedule
Yes
Primary Communication Module/Device Brand Name and Model Number
SkyCentrics-US02A
Is Broadband Internet Connection Needed for Demand Response?